LILCO quality assurance summary remarks /presented by W. J. Museler before the Shoreham Commission meeting.
LILCO quality assurance summary remarks /presented by W. J. Museler before the Shoreham Commission meeting.
dc.date.accessioned | 2021-08-17T06:34:05Z | |
dc.date.available | 2021-08-17T06:34:05Z | |
dc.identifier.uri | http://hdl.handle.net/11401/92700 | |
dc.subject | Nuclear power plants-- New York (State) --Shoreham --Design and construction. | |
dc.title | LILCO quality assurance summary remarks /presented by W. J. Museler before the Shoreham Commission meeting. | |
dcterms.creator | Museler, W. J.--Asst.Project Manager, LILCO. | |
dcterms.dateAccepted | 2015-01-21 | |
dcterms.extent | 11 leaves ; 28 cm. | |
dcterms.identifier | LILCO Quality Assurance Summary Remarks.pdf | |
dcterms.isFormatOf | TK9152 .S5 L54 1983 | |
dcterms.issued | 1983 | |
dcterms.language | en | |
dcterms.modified | 2015-01-21 | |
dcterms.provenance | 2012 | |
dcterms.provenance | This work is based on an original, analog entitled work. | |
dcterms.provenance | Format.Creation: This PDF document was created by Preservation Department staff using in-house software to first generate master G4 TIFF images captured at 600 dpi, 8 bit, greyscale color setting, and then Optical Character Recognition software to assist Adobe Photoshop CS 3 software checks and PDF conversion. Graphics images such as the maps contained within the PDF were captures at 300 dpi, 24 bit, color setting. | |
dcterms.publisher | Albany, NY: Standing Committee on Energy of the New York State Assembly. | |
dcterms.subject | Nuclear power plants-- New York (State) --Shoreham --Design and construction. | |
dcterms.title | LILCO quality assurance summary remarks /presented by W. J. Museler before the Shoreham Commission meeting. | |
dcterms.type | Text |